Project Examples
Typical projects range from pressure vessels, process mixing systems and CIP systems up to the design, build and commissioning of fully automatic membrane filtration systems.
![]() Rototherm, a World Leader in the supply of industrial instrumentation and services, has developed a unique procedure which can measure sound resonance from fluid streams flowing through oil and gas industry pipelines. As part of the testing process Rototherm commissioned Axium Process to help design and build a 316 stainless steel vibration test skid. Adjustments of upstream pressures are made by varying sized orifice plates with test pressures of up to 16 Bar. |
![]() Ransom Naturals Ltd (RNL), part of the OBG Pharmaceuticals Group, commissioned Axium Process to design and build a mobile ATEX Zone One rated membrane filtration plant able to move to a number of positions in their factory. Ransom Naturals worked closely with Axium's engineers to develop a system that would process an aqueous or solvent based extraction process to reliably remove suspended solids and bioburden from raw plant extracts to meet product specifications. |
![]() Axium Process specialises in the design and fabrication of fully automated CIP Skids, complete with control panel, PLC and software. Each System is developed by a dedicated project engineer who works closely with the customer to ensure that their requirements are fully complied with in terms of design, procurement and manufacturing stages. |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() Following a series of trials to assess the suitability of membrane technology against specific site demands, our engineers designed, built and commissioned a self-contained ultrafiltration membrane plant which is successfully treating up to 140,000 litres of landfill leachate per day Waste Recycling Group’s North Lincolnshire site. |
![]() Manufactured in 304 stainless steel with 316 stainless steel contact parts and DNV (Det Norsk Veritas) accreditation to 2.7-1, this high flow triplex filter skid was designed and built for the 3M Oil and Gas market centre, to be used onshore and offshore for the filtration of waste waters and well bore completion fluids. |
![]() Fully commissioned in late 2009, the water recycling plant is handling 3 million litres of wastewater per week and is specifically designed to allow the mill to recycle the water on a continuous basis. All contaminants are removed from the washing and dyeing processes enabling the water to be reused without entering the eco-system. The payback period for the membrane effluent treatment system, including all the civil engineering and commissioning, was less than three years. |
![]() This fully documented fabrication consisted of a giant coiled tubular ring which stands vertically when in position was supplied with a traceability dossier consisting of weld logs, weld maps, material and passivation certification. |